WMS teamed up with civil engineering firm Dryside Engineering to deliver the FIA and detailed design of the basin.
Indigo Shire Council
Chiltern Flood Study & Evaluation of Flood Mitigation Works
VIC Department of Environment, Land, Water and Planning (DELWP)
Coleraine Flood Investigation Study Review
icubed consulting
Witmack Road Power Facility Flood Assessment
Sunshine Coast Council
Sunshine LGA Road Immunity Analysis
Semi-automated Tool Development
Tenterfield Shire Council
Tenterfield Dam Bathymetric Survey
WMS conducted a highly accurate bathymetric survey using a Sontek M9 ADCP to accurately determine the volume of water remaining in the dam and the volume of sediment.