
Design of Drummond Creek Floodway
A new floodway design improving flood immunity whilst maintaining design speed requirements
Public Safety Business Agency
Mossman Stormwater Management Plan
Coomera River Hydraulic Model Peer Review

City of Port Adelaide Enfield
Port Adelaide Pump Station Tender
Feasibility study for two new pump stations and associated trunk drainage in the Port Centre Catchment
Buchan Caves Reserve – Flood Modelling

Murrin Murrin Operations Renewable Energy Project
Hydrology study

McKinnon Creek Detention Basin Failure Impact Assessment
WMS was engaged to undertake a comprehensive Failure Impact Assessment (FIA) for the McKinnon Creek Detention Basin