Toowoomba Regional Council
Cooyar Urban Stormwater Management Plan Peer Review
Jalarra Park Detention Basin
WMS teamed up with civil engineering firm Dryside Engineering to deliver the FIA and detailed design of the basin.
Parade Streetscape Upgrade
Flood impact assessment to support the Parade Masterplan
Buchan Caves Reserve – Flood Modelling
Design of Drummond Creek Floodway
A new floodway design improving flood immunity whilst maintaining design speed requirements
Rocky Creek Dam Bathymetric Survey