WMS conducted a highly accurate bathymetric survey using a Sontek M9 ADCP to accurately determine the volume of water remaining in the dam and the volume of sediment.
Moree Plains Shire Council
Pallamallawa Levee Design Review
WMS partnered with Dryside Engineering to deliver the Pallamallawa Northern Levee Second Design Review
Toowoomba Regional Council
Millmerran Urban Stormwater Master Plan
The aim of this project was also to investigate and address local stormwater quality conditions and future requirements relating to Water Sensitive Urban Design (WSUD).