Maryborough Flood Study

Hydrologic and hydraulic assessment in regional Victoria
Amanda
Questions? Get in touch today.
Amanda Tobias

Client

Central Goldfields Shire Council

Scope

Hydrologic and hydraulic modeling, flood mapping, improved data, drainage mitigation options

Impact

The Maryborough Flood Study assessed flood risks, modelled design events, and explored mitigation options. It recommended effective strategies, early warning systems, and integrating flood resilience into local planning for future development.
Amanda
Questions? Get in touch today.
Amanda Tobias

Client

Central Goldfields Shire Council

Scope

Hydrologic and hydraulic modeling, flood mapping, improved data, drainage mitigation options

Impact

The Maryborough Flood Study assessed flood risks, modelled design events, and explored mitigation options. It recommended effective strategies, early warning systems, and integrating flood resilience into local planning for future development.

The Maryborough Flood Study aimed to assess and develop options to mitigate flood risks in the Maryborough township and Four Mile Creek catchment. This study utilised hydrologic and hydraulic models validated to historical flood events from January 2011 and December 1999. The study modelled a wide range of design flood events, including various storm durations and climate change scenarios, to ensure comprehensive flood mapping and risk analysis. Sensitivity tests were conducted for factors such as roughness changes, blockage, and downstream boundary conditions, ensuring the models accounted for variable flood behaviors.

Maryborough Site Visit 1Maryborough Site visit 2

Several flood mitigation options were explored, starting with preliminary assessments to gauge their potential effectiveness in reducing flood risks, followed by more detailed evaluations of feasibility, including cost analysis and benefit assessments. The study recommended that the council consider implementing one of the modeled strategies while emphasizing the importance of flood intelligence outputs and early warning systems for effective disaster management.

To support long-term flood resilience, draft planning layers were developed, with a recommendation for integration into the local planning scheme to ensure flood risk considerations are reflected in future development decisions.

Related Projects

City of Gold Coast

Loders Creek Hydraulic Model Peer Review

Water Level @ Bendigo Creek, Bay Street Golden Square
City of Greater Bendigo Council

Kangaroo Flat and Golden Square Flood Mitigation Study

A wonderful collaboration between government bodies, experts and the community that delivered effective solutions to mitigate future flood events.
Queensland Rail

Duck Creek Flood Study

Queensland Rail

Plain Creek Flood Study

Buchan Caves Reserve – Flood Modelling

Preston Consulting

SWIS Peaker Project Flood Impact Assessment

Application of HEC-HMS and HEC-RAS software to assess flood risk from Cataby Brook and Minyulo Brook
Toowomba Second Range Crossing
Toowoomba Regional Council

Toowoomba Second Range Crossing

Infrastructure of national significance