
Hay Street Pedestrian Bridge Replacement
The objective of this project was to undertake hydraulic modelling and flood impact assessment to inform the design of the new bridge.

Water Modelling Solutions and SMK Consultants
WMS and SMK Consultants Collaborate to have levees approved for farmers across rural New South Wales.
Parramatta River Flood Modelling
Roseneath Unsealed Roads Hydraulic Assessment

Flood Impact Assessment of Crown Lands Assets
Condition Assessments and Recommendations for Remediation Actions

Jalarra Park Detention Basin
WMS teamed up with civil engineering firm Dryside Engineering to deliver the FIA and detailed design of the basin.
Wallsend Flood Risk Management Plan