WMS partnered with Dryside Engineering to deliver the Pallamallawa Northern Levee Second Design Review
Arup
North Queensland Stadium Flood Impact Assessment
Tenterfield Shire Council
Tenterfield Dam Bathymetric Survey
WMS conducted a highly accurate bathymetric survey using a Sontek M9 ADCP to accurately determine the volume of water remaining in the dam and the volume of sediment.
Parks Victoria
Buchan Caves Reserve – Flood Modelling
Hydraulic assessment to inform post-disaster restoration