Summerfield BESS Flood Impact Assessment | WMS Engineering
Hoffmann Rd, Tepko SA 5254, Australia

Summerfield BESS Flood Impact Assessment

Hydraulic assessment to inform site layout and surface water management
Mark Lovell
Questions? Get in touch today.
Mark Lovell

Client

iCubed Consulting Pty Ltd

Scope

Conduct hydrological assessment, flood study, and stormwater management plan for Summerfield BESS

Impact

Sustainable flood risk management and water quality solutions for the Summerfield BESS through risk-informed site layout design.
Mark Lovell
Questions? Get in touch today.
Mark Lovell

Client

iCubed Consulting Pty Ltd

Scope

Conduct hydrological assessment, flood study, and stormwater management plan for Summerfield BESS

Impact

Sustainable flood risk management and water quality solutions for the Summerfield BESS through risk-informed site layout design.
summerfield aerial view

The Summerfield Battery Energy Storage System (BESS) is a proposed renewable energy project located in Tepko, South Australia. The development will feature a 240 MW BESS, gas turbine, solar farm, and related infrastructure across a 34 ha site. WMS Engineering was engaged to conduct a hydrology assessment to evaluate the flood risks and develop a stormwater management plan for the site. The project aimed to identify potential flood impacts both pre- and post-development, with a focus on minimised risks to infrastructure and surrounding areas.

WMS conducted a comprehensive flood investigation using a TUFLOW hydraulic model to simulate flood behavior on the site, as seen in the images below. The study involved a rain-on-grid ensemble approach, incorporating site survey data and SRTM topographic data. The flood modelling was performed for various storm events, including the 1%, 2%, 5%, and 10% Annual Exceedance Probability (AEP) events. Key findings included low surface water risks, with the primary concern being the potential for infrastructure to obstruct the main creek reach. The study also confirmed that the project would not cause adverse flooding impacts on neighboring properties.

The hydrology assessment included recommendations for the detailed design phase, such as the construction of culverts or floodways at the access road to maintain flow and reduce flood risk. Additionally, suggestions were made to the access road to ensure optimal runoff management, and infrastructure pads to avoid frequent ponding. While the study used coarse resolution data and regional assumptions due to limited data availability, it layed the foundation for more detailed assessments using higher resolution terrain data in the future.

summerfield battery storage

Related Projects

Charters Towers river flood map
Charters Towers Regional Council

Charters Towers Retention Basin Modelling

Feasibility Assessment of Two Proposed Retention Basins
Central Goldfields Shire Council

Maryborough Flood Study

Hydrologic and hydraulic assessment in regional Victoria
Gatton flood map
Toowoomba Regional Council

Stormwater Catchment Modelling, Planning and Design for Gatton

WMS, in conjunction with RMA Engineers, were commissioned to undertake stormwater catchment modelling, planning and design for the township of Gatton.
Temora Shire Council

Temora Flood Study

Swan Hill Site Visit 1
Swan Hill Rural City Council

Swan Hill Drainage Strategy

Assessment of current drainage performance, identification of capacity shortfalls and investigation of potential mitigation options
Dryside Engineering

Moree Flood Study Update

Site Inspection of Farm Levee at North Star
SMK Consultants

Water Modelling Solutions and SMK Consultants

WMS and SMK Consultants Collaborate to have levees approved for farmers across rural New South Wales.