McKinnon Creek Detention Basin Failure Impact Assessment
WMS was engaged to undertake a comprehensive Failure Impact Assessment (FIA) for the McKinnon Creek Detention Basin
Toowoomba Regional Council
Oakey Floodplain Risk Management Study and Plan
Toowoomba Regional Council
Bostock Road Bridge Design
NSW Department of Planning, Industry and Environment (DPIE)
Murray Land & Water Management
NSW DPIE engaged WMS to update the Murray LWMP salinity modelling framework using contemporary platforms
Dryside Engineering
Moree Flood Study Update
City of Greater Geelong
Marshall Precinct Stormwater Management Strategy
The primary aim of the SWMS is to investigate the impact that the transition from rural residential land uses into predominantly urban, residential development will have on surface water within and beyond the PSP boundary.