WMS teamed up with civil engineering firm Dryside Engineering to deliver the FIA and detailed design of the basin.
City of Gold Coast
Biggera Creek Hydraulic Model Peer Review
Queensland Rail
Duck Creek Flood Study
City of Gold Coast
Woongoolba Floodplain Analysis
Toowoomba Regional Council
Oakey Overland Flow Path Study
Tenterfield Shire Council
Tenterfield Dam Bathymetric Survey
WMS conducted a highly accurate bathymetric survey using a Sontek M9 ADCP to accurately determine the volume of water remaining in the dam and the volume of sediment.