
Jalarra Park Detention Basin
WMS teamed up with civil engineering firm Dryside Engineering to deliver the FIA and detailed design of the basin.

Buchan Caves Reserve – Flood Modelling
Hydraulic assessment to inform post-disaster restoration

Glengarry Stormwater Study
Comprehensive flood mitigation study for the township of Glengarry
Haughton River Floodplain Upgrade Peer Review
Narrandera Detention Basin Strategy and Design

Management Protocols Document Development
Development of an Operating Protocols Document for the Bogan Shire Water Supply Scheme