Management Protocols Document Development | WMS Engineering
Ski Ln, Nyngan NSW 2825, Australia

Management Protocols Document Development

Development of an Operating Protocols Document for the Bogan Shire Water Supply Scheme
Allen Lal
Allen Lal
Questions? Get in touch today.
Allen Lal

Client

Bogan Shire Council

Scope

Development of operating protocols for the Bogan Shire Water Supply Scheme

Impact

The project enhances water security by standardising operations, ensuring regulatory compliance, and guiding efficient water resource management for Bogan Shire during drought, flood, and normal conditions
Allen Lal
Allen Lal
Questions? Get in touch today.
Allen Lal

Client

Bogan Shire Council

Scope

Development of operating protocols for the Bogan Shire Water Supply Scheme

Impact

The project enhances water security by standardising operations, ensuring regulatory compliance, and guiding efficient water resource management for Bogan Shire during drought, flood, and normal conditions
Nyngan Site Visit 1

WMS Engineering was engaged by Bogan Shire Council (BSC) to develop an Operating Protocols Document for the Bogan Shire Water Supply Scheme, which sourced water primarily from the regulated Macquarie River and supplemented by flows from the Bogan River during suitable conditions. To enhance water security during droughts, two 700 ML off-river storages were constructed in Nyngan in 2022, providing additional drought storage capacity. However, no formal document exsited to guide the overall operation of the water supply scheme under varying conditions, prompting the need for a standardized operational framework.

The Operating Protocols Document captured existing operational knowledge and established a clear decision-making framework for managing the system during normal, flood, drought, and incident conditions. It outlined the key objectives and philosophy of the scheme, described the system’s operational configurations under different scenarios, and identified regulatory and environmental requirements that influence operational decisions.

Nyngan Site Visit 2

The development of the Operating Protocols also considered ongoing and potential projects or policy changes that could impact the system’s operation, such as the Nyngan to Cobar Pipeline upgrade, changes in extraction patterns by irrigators and mining sectors, and the Macquarie–Castlereagh Regional Water Strategy. By providing a structured and adaptable framework, the document supported the council in making informed operational decisions, ensured water security, regulatory compliance, and efficient water resource management across the region.

Related Projects

Toowoomba Regional Council

Maclagan and Quinalow Floodplain Risk Management Study and Plan

Hay Street Pedestrian Bridge
Brisbane City Council

Hay Street Pedestrian Bridge Replacement

The objective of this project was to undertake hydraulic modelling and flood impact assessment to inform the design of the new bridge.
buchan caves 1
Parks Victoria

Buchan Caves Reserve – Flood Modelling

Hydraulic assessment to inform post-disaster restoration
Murrin Murrin PV
iCubed Consulting

Murrin Murrin Operations Renewable Energy Project

Hydrology study
icubed consulting

MacIntyre Wind Farm Flood Assessment

Arup (for Queensland Rail)

North Coast Rail Line Timber Bridge Replacements

Cowra Water Treatment Plant
Cowra Shire Council

Cowra Water Treatment Plant Reservoir CFD Modelling

CFD modelling to determine chlorine contact time