
Cowra Water Treatment Plant Reservoir CFD Modelling
CFD modelling to determine chlorine contact time

Buchan Caves Reserve – Flood Modelling
Hydraulic assessment to inform post-disaster restoration
Nerang River Hydraulic Model Peer Review

Moree Plains Shire Council
Pallamallawa Levee Design Review
WMS partnered with Dryside Engineering to deliver the Pallamallawa Northern Levee Second Design Review

Jalarra Park Detention Basin
WMS teamed up with civil engineering firm Dryside Engineering to deliver the FIA and detailed design of the basin.
Toowoomba Regional Council
Crows Nest Floodplain Risk Management Study and Plan
Toowoomba Regional Council
Maclagan and Quinalow Floodplain Risk Management Study and Plan