WMS conducted a highly accurate bathymetric survey using a Sontek M9 ADCP to accurately determine the volume of water remaining in the dam and the volume of sediment.
Toowoomba Regional Council
Oakey Floodplain Risk Management Study and Plan
Indigo Shire Council
Chiltern Flood Study & Evaluation of Flood Mitigation Works
juwi Renewable Energy
Dulacca Solar Farm Stormwater Assessment
Shoalhaven City Council
Currarong Creek Flood Study
Toowoomba Regional Council
Maclagan and Quinalow Floodplain Risk Management Study and Plan