
Design of Drummond Creek Floodway
A new floodway design improving flood immunity whilst maintaining design speed requirements

Sunshine LGA Road Immunity Analysis
Semi-automated Tool Development

Swan Hill Rural City Council
Swan Hill Drainage Strategy
Assessment of current drainage performance, identification of capacity shortfalls and investigation of potential mitigation options

Jalarra Park Detention Basin
WMS teamed up with civil engineering firm Dryside Engineering to deliver the FIA and detailed design of the basin.
Emigrant Creek Dam Bathymetric Survey

Toowoomba Regional Council
Toowoomba Second Range Crossing
Infrastructure of national significance