The primary aim of the SWMS is to investigate the impact that the transition from rural residential land uses into predominantly urban, residential development will have on surface water within and beyond the PSP boundary.
Brisbane City Council
Hay Street Pedestrian Bridge Replacement
The objective of this project was to undertake hydraulic modelling and flood impact assessment to inform the design of the new bridge.
SMK Consultants
Water Modelling Solutions and SMK Consultants
WMS and SMK Consultants Collaborate to have levees approved for farmers across rural New South Wales.
Toowoomba Regional Council
Jondaryan Floodplain Risk Management Study and Plan
Rous County Council
Rocky Creek Dam Bathymetric Survey
Charters Towers Regional Council
Charters Towers Retention Basin Modelling
Feasibility Assessment of Two Proposed Retention Basins