
Glengarry Stormwater Study
Comprehensive flood mitigation study for the township of Glengarry

Jalarra Park Detention Basin
WMS teamed up with civil engineering firm Dryside Engineering to deliver the FIA and detailed design of the basin.

Management Protocols Document Development
Development of an Operating Protocols Document for the Bogan Shire Water Supply Scheme
Chiltern Flood Study & Evaluation of Flood Mitigation Works
Chinchilla Solar Farm Stormwater Assessment
Haughton River Floodplain Upgrade Peer Review
Opus International Consultants (now part of WSP)
State Highway 2 Upgrade