Jalarra Park Detention Basin
WMS teamed up with civil engineering firm Dryside Engineering to deliver the FIA and detailed design of the basin.
Toowoomba Regional Council
Oakey Overland Flow Path Study

Moree Plains Shire Council
Pallamallawa Levee Design Review
WMS partnered with Dryside Engineering to deliver the Pallamallawa Northern Levee Second Design Review
Currumbin Creek Hydraulic Model Peer Review

Water Modelling Solutions and SMK Consultants
WMS and SMK Consultants Collaborate to have levees approved for farmers across rural New South Wales.

Hay Street Pedestrian Bridge Replacement
The objective of this project was to undertake hydraulic modelling and flood impact assessment to inform the design of the new bridge.

Cowra Water Treatment Plant Reservoir CFD Modelling
CFD modelling to determine chlorine contact time