
Jalarra Park Detention Basin
WMS teamed up with civil engineering firm Dryside Engineering to deliver the FIA and detailed design of the basin.

Cowra Water Treatment Plant Reservoir CFD Modelling
CFD modelling to determine chlorine contact time

North Central Catchment Management Authority
Korong Vale Flood Study
Hydrologic and hydraulic assessment in regional Victoria

Management Protocols Document Development
Development of an Operating Protocols Document for the Bogan Shire Water Supply Scheme
Toowoomba Regional Council
Cooyar Urban Stormwater Management Plan Peer Review

Hay Street Pedestrian Bridge Replacement
The objective of this project was to undertake hydraulic modelling and flood impact assessment to inform the design of the new bridge.

Parade Streetscape Upgrade
Flood impact assessment to support the Parade Masterplan