WMS conducted a highly accurate bathymetric survey using a Sontek M9 ADCP to accurately determine the volume of water remaining in the dam and the volume of sediment.
icubed Consulting
Water Modelling Solutions and I3 Consulting Prove a Dream Team
The WMS and icubed partnership proved a successful one, seeing projects approved more quickly and smoothly by local authorities.
SMEC
Wallsend Flood Risk Management Plan
Toowoomba Regional Council
Condamine River Flood Study
Toowoomba Regional Council
Millmerran Urban Stormwater Master Plan
The aim of this project was also to investigate and address local stormwater quality conditions and future requirements relating to Water Sensitive Urban Design (WSUD).
Queensland Rail
Koumala Flood Study
Toowoomba Regional Council
Clifton Urban Stormwater Management Plan Peer Review