Working with Entec, WMS undertook the hydrologic and hydraulic analyses and scour assessments to inform detailed design of four bridges on the island of Viti Levu.
City of Gold Coast
Currumbin Creek Hydraulic Model Peer Review
Glenelg Hopkins Catchment Management Authority
Port Fairy Hydraulic Model Review
City of Gold Coast
Nerang River Hydraulic Model Peer Review
City of Gold Coast
Woongoolba Floodplain Analysis
Queensland Rail
Koumala Flood Study
City of Greater Geelong
Marshall Precinct Stormwater Management Strategy
The primary aim of the SWMS is to investigate the impact that the transition from rural residential land uses into predominantly urban, residential development will have on surface water within and beyond the PSP boundary.