Assessment of current drainage performance, identification of capacity shortfalls and investigation of potential mitigation options
Brisbane City Council
Hay Street Pedestrian Bridge Replacement
The objective of this project was to undertake hydraulic modelling and flood impact assessment to inform the design of the new bridge.
Arup
Roseneath Unsealed Roads Hydraulic Assessment
Aurecon
Brisbane Airport Drainage Assessment
Central Goldfields Shire Council
Maryborough Flood Study
Hydrologic and hydraulic assessment in regional Victoria
Toowoomba Regional Council
Condamine River Flood Study
Rockhampton Regional Council
Washpool Road Preliminary Design of Stormwater Infrastructure
WMS was engaged by Rockhampton Regional Council to identify and prioritise Council’s plan for future trunk infrastructure (PFTIs) for the Washpool Road area.