Stormwater Catchment Modelling, Planning and Design for Gatton
WMS, in conjunction with RMA Engineers, were commissioned to undertake stormwater catchment modelling, planning and design for the township of Gatton.
Tenterfield Shire Council
Tenterfield Dam Bathymetric Survey
WMS conducted a highly accurate bathymetric survey using a Sontek M9 ADCP to accurately determine the volume of water remaining in the dam and the volume of sediment.
Parks Victoria
Buchan Caves Reserve – Flood Modelling
Hydraulic assessment to inform post-disaster restoration
City of Greater Bendigo
Racecourse Creek Levee Design
Queensland Rail
Plain Creek Flood Study
Toowoomba Regional Council
Cooyar Urban Stormwater Management Plan Peer Review