InterLinkSQ Freight Terminal Modelling
Toowoomba Regional Council
Cooyar Urban Stormwater Management Plan Peer Review

Design of Drummond Creek Floodway
A new floodway design improving flood immunity whilst maintaining design speed requirements
Currarong Creek Flood Study

Yarranlea Solar Farm Flood Impact Assessment
A Smooth Path to DA Approval

Jalarra Park Detention Basin
WMS teamed up with civil engineering firm Dryside Engineering to deliver the FIA and detailed design of the basin.

Murrin Murrin Operations Renewable Energy Project
Hydrology study