Condition Assessments and Recommendations for Remediation Actions
Buchan Caves Reserve – Flood Modelling
Toowoomba Regional Council
Yarraman Urban Stormwater Management Plan Peer Review
City of Gold Coast
Broadwater Master Plan
City of Greater Geelong
Marshall Precinct Stormwater Management Strategy
The primary aim of the SWMS is to investigate the impact that the transition from rural residential land uses into predominantly urban, residential development will have on surface water within and beyond the PSP boundary.
iCubed Consulting
Murrin Murrin Operations Renewable Energy Project
Hydrology study
Isaac Regional Council
Design of Drummond Creek Floodway
A new floodway design improving flood immunity whilst maintaining design speed requirements