Pallamallawa Levee Design Review | WMS Engineering
Pallamallawa NSW, Australia

Pallamallawa Levee Design Review

WMS partnered with Dryside Engineering to deliver the Pallamallawa Northern Levee Second Design Review
Catherine Walker
Questions? Get in touch today.
Catherine Walker

Client

Moree Plains Shire Council

Scope

Complete a Northern Levee Second Design Review with community involvement

Impact

Community alignement with the preferred option for the Northern Levee
Catherine Walker
Questions? Get in touch today.
Catherine Walker

Client

Moree Plains Shire Council

Scope

Complete a Northern Levee Second Design Review with community involvement

Impact

Community alignement with the preferred option for the Northern Levee

Project Description

WMS partnered with Dryside Engineering to deliver the Pallamallawa Northern Levee Second Design Review. The review
included:

  • Extension of hydrologic and hydraulic model boundaries to capture hydraulic structures and flow paths to the east of town;
  • Modelling of the three WRM recommendations, as well as three additional mitigation options for the flooding in the east side of town;
  • One-on-one and public meeting style community consultation;
  • Identification of the preferred option(s) for the Northern Levee upgrade and associated works; and
  • Production of concept design and cost estimate for the preferred option

Benefit to the client

The successful delivery of the review ensured that the Pallamallawa community had confidence in the project and
modelling methodology, understood the impacts of the different flood mitigation options, is involved in the optioneering process, and is aligned with the preferred option for the Northern Levee; and allowed Council to progress the upgrade of the Pallamallawa Northern Levee to detailed design and seek further grant funding as needed. These outcomes were achieved through the development of an adequate suite of hydrologic and hydraulic models and a community engagement plan that ensured the participation of the community throughout the entire project. The review allowed for the upgrade of the existing Northern Levee to improve the levee’s performance and to mitigate local overland
flow issues.

Related Projects

Charters Towers river flood map
Charters Towers Regional Council

Charters Towers Retention Basin Modelling

Feasibility Assessment of Two Proposed Retention Basins
Hay Street Pedestrian Bridge
Brisbane City Council

Hay Street Pedestrian Bridge Replacement

The objective of this project was to undertake hydraulic modelling and flood impact assessment to inform the design of the new bridge.
Sunshine Coast Storm Surge
Sunshine Coast Regional Council (SCRC)

Sunshine Coast Extreme Flood Hazard Mapping

Filling a Knowledge Gap on Flood Severity in Rare Events
Collinson McKinnon Basin
Cairns Regional Council

McKinnon Creek Detention Basin Failure Impact Assessment

WMS was engaged to undertake a comprehensive Failure Impact Assessment (FIA) for the McKinnon Creek Detention Basin
Water Level @ Bendigo Creek, Bay Street Golden Square
City of Greater Bendigo Council

Kangaroo Flat and Golden Square Flood Mitigation Study

A wonderful collaboration between government bodies, experts and the community that delivered effective solutions to mitigate future flood events.
Toowomba Second Range Crossing
Toowoomba Regional Council

Toowoomba Second Range Crossing

Infrastructure of national significance
Noosa Aerial photo
Sunshine Coast Council

Sunshine LGA Road Immunity Analysis

Semi-automated Tool Development