Jalarra Park Detention Basin
WMS teamed up with civil engineering firm Dryside Engineering to deliver the FIA and detailed design of the basin.
Chiltern Flood Study & Evaluation of Flood Mitigation Works
Emigrant Creek Dam Bathymetric Survey
Hay Street Pedestrian Bridge Replacement
The objective of this project was to undertake hydraulic modelling and flood impact assessment to inform the design of the new bridge.
Swan Hill Rural City Council
Swan Hill Drainage Strategy
Assessment of current drainage performance, identification of capacity shortfalls and investigation of potential mitigation options
VIC Department of Environment, Land, Water and Planning (DELWP)
Coleraine Flood Investigation Study Review
Casuarina Street Emergency Works | Hydraulic Assessment
Hydraulic bridge design