Management Protocols Document Development | WMS Engineering
Ski Ln, Nyngan NSW 2825, Australia

Management Protocols Document Development

Development of an Operating Protocols Document for the Bogan Shire Water Supply Scheme
Allen Lal
Allen Lal
Questions? Get in touch today.
Allen Lal

Client

Bogan Shire Council

Scope

Development of operating protocols for the Bogan Shire Water Supply Scheme

Impact

The project enhances water security by standardising operations, ensuring regulatory compliance, and guiding efficient water resource management for Bogan Shire during drought, flood, and normal conditions
Allen Lal
Allen Lal
Questions? Get in touch today.
Allen Lal

Client

Bogan Shire Council

Scope

Development of operating protocols for the Bogan Shire Water Supply Scheme

Impact

The project enhances water security by standardising operations, ensuring regulatory compliance, and guiding efficient water resource management for Bogan Shire during drought, flood, and normal conditions
Nyngan Site Visit 1

WMS Engineering was engaged by Bogan Shire Council (BSC) to develop an Operating Protocols Document for the Bogan Shire Water Supply Scheme, which sourced water primarily from the regulated Macquarie River and supplemented by flows from the Bogan River during suitable conditions. To enhance water security during droughts, two 700 ML off-river storages were constructed in Nyngan in 2022, providing additional drought storage capacity. However, no formal document exsited to guide the overall operation of the water supply scheme under varying conditions, prompting the need for a standardized operational framework.

The Operating Protocols Document captured existing operational knowledge and established a clear decision-making framework for managing the system during normal, flood, drought, and incident conditions. It outlined the key objectives and philosophy of the scheme, described the system’s operational configurations under different scenarios, and identified regulatory and environmental requirements that influence operational decisions.

Nyngan Site Visit 2

The development of the Operating Protocols also considered ongoing and potential projects or policy changes that could impact the system’s operation, such as the Nyngan to Cobar Pipeline upgrade, changes in extraction patterns by irrigators and mining sectors, and the Macquarie–Castlereagh Regional Water Strategy. By providing a structured and adaptable framework, the document supported the council in making informed operational decisions, ensured water security, regulatory compliance, and efficient water resource management across the region.

Related Projects

Hay Street Pedestrian Bridge
Brisbane City Council

Hay Street Pedestrian Bridge Replacement

The objective of this project was to undertake hydraulic modelling and flood impact assessment to inform the design of the new bridge.
City of Gold Coast

Coomera River Hydraulic Model Peer Review

Narrandera Shire Council

Narrandera Detention Basin Strategy and Design

Marshall Precinct
City of Greater Geelong

Marshall Precinct Stormwater Management Strategy

The primary aim of the SWMS is to investigate the impact that the transition from rural residential land uses into predominantly urban, residential development will have on surface water within and beyond the PSP boundary.
Yarranlea Solar Farm
icubed Consulting

Water Modelling Solutions and I3 Consulting Prove a Dream Team

The WMS and icubed partnership proved a successful one, seeing projects approved more quickly and smoothly by local authorities.
juwi Renewable Energy

Dulacca Solar Farm Stormwater Assessment

Toowoomba Regional Council

Oakey Overland Flow Path Study