
Jalarra Park Detention Basin
WMS teamed up with civil engineering firm Dryside Engineering to deliver the FIA and detailed design of the basin.
Coomera River Hydraulic Model Peer Review
Currumbin Creek Hydraulic Model Peer Review
Currarong Creek Flood Study

Cowra Water Treatment Plant Reservoir CFD Modelling
CFD modelling to determine chlorine contact time
Toowoomba Regional Council
Yarraman Urban Stormwater Management Plan Peer Review

Glengarry Stormwater Study
Comprehensive flood mitigation study for the township of Glengarry