The objective of this project was to undertake hydraulic modelling and flood impact assessment to inform the design of the new bridge.
City of Greater Geelong
Marshall Precinct Stormwater Management Strategy
The primary aim of the SWMS is to investigate the impact that the transition from rural residential land uses into predominantly urban, residential development will have on surface water within and beyond the PSP boundary.
Central Goldfields Shire Council
Maryborough Flood Study
Hydrologic and hydraulic assessment in regional Victoria
Rous County Council
Rocky Creek Dam Bathymetric Survey
Entec
Waqadra Subdivision Flood Assessment
Charters Towers Regional Council
Charters Towers Retention Basin Modelling
Feasibility Assessment of Two Proposed Retention Basins
Dryside Engineering
Parade Streetscape Upgrade
Flood impact assessment to support the Parade Masterplan