Clifton Urban Stormwater Management Plan Peer Review
Tenterfield Shire Council
Tenterfield Dam Bathymetric Survey
WMS conducted a highly accurate bathymetric survey using a Sontek M9 ADCP to accurately determine the volume of water remaining in the dam and the volume of sediment.
Melbourne Water
Southbank Hydraulic Model Update
GenEng Solutions
InterLinkSQ Freight Terminal Modelling
Latrobe City Council
Glengarry Stormwater Study
Comprehensive flood mitigation study for the township of Glengarry
Swan Hill Rural City Council
Swan Hill Drainage Strategy
Assessment of current drainage performance, identification of capacity shortfalls and investigation of potential mitigation options
Cairns Regional Council
Jalarra Park Detention Basin
WMS teamed up with civil engineering firm Dryside Engineering to deliver the FIA and detailed design of the basin.