Feasibility Assessment of Two Proposed Retention Basins
Clare & Gilbert Valleys Council
Daly St Drainage Detailed Design
Stormwater impact assessment
Shoalhaven City Council
Currarong Creek Flood Study
Tenterfield Shire Council
Tenterfield Dam Bathymetric Survey
WMS conducted a highly accurate bathymetric survey using a Sontek M9 ADCP to accurately determine the volume of water remaining in the dam and the volume of sediment.
Opus International Consultants (now part of WSP)
Finke River Crossing Flood Study
Cairns Regional Council
McKinnon Creek Detention Basin Failure Impact Assessment
WMS was engaged to undertake a comprehensive Failure Impact Assessment (FIA) for the McKinnon Creek Detention Basin