Clifton Urban Stormwater Management Plan Peer Review
Cowra Shire Council
Cowra Water Treatment Plant Reservoir CFD Modelling
CFD modelling to determine chlorine contact time
icubed consulting
MacIntyre Wind Farm Flood Assessment
Brisbane City Council
Hay Street Pedestrian Bridge Replacement
The objective of this project was to undertake hydraulic modelling and flood impact assessment to inform the design of the new bridge.
Toowoomba Regional Council
Stormwater Catchment Modelling, Planning and Design for Gatton
WMS, in conjunction with RMA Engineers, were commissioned to undertake stormwater catchment modelling, planning and design for the township of Gatton.
Queensland Rail
Mount Ossa Flood Study
Rockhampton Regional Council
Washpool Road Preliminary Design of Stormwater Infrastructure
WMS was engaged by Rockhampton Regional Council to identify and prioritise Council’s plan for future trunk infrastructure (PFTIs) for the Washpool Road area.