
Jalarra Park Detention Basin
WMS teamed up with civil engineering firm Dryside Engineering to deliver the FIA and detailed design of the basin.
Gladstone Regional Council
Baffle Creek Bathymetric Survey
Tuvatu Gold Mine Hydrologic Investigation Review
Chinchilla Solar Farm Stormwater Assessment
Woongoolba Floodplain Analysis

iCubed Consulting Pty Ltd
Summerfield BESS Flood Impact Assessment
Hydraulic assessment to inform site layout and surface water management

North Central Catchment Management Authority
Korong Vale Flood Study
Hydrologic and hydraulic assessment in regional Victoria