Stormwater Catchment Modelling, Planning and Design for Gatton

WMS, in conjunction with RMA Engineers, were commissioned to undertake stormwater catchment modelling, planning and design for the township of Gatton.
Blake Boulton
Questions? Get in touch today.
Blake Boulton

Client

Toowoomba Regional Council

Scope

Stormwater catchment modelling, planning and design for the township of Gatton

Impact

Prioritisation schedule, concept designs and suggested improvements to existing detention basins, ready to take to detailed design
Blake Boulton
Questions? Get in touch today.
Blake Boulton

Client

Toowoomba Regional Council

Scope

Stormwater catchment modelling, planning and design for the township of Gatton

Impact

Prioritisation schedule, concept designs and suggested improvements to existing detention basins, ready to take to detailed design

WMS, in conjunction with RMA Engineers, were commissioned by Lockyer Valley Regional Council to undertake stormwater catchment modelling, planning and design for the township of Gatton. Some areas of the town are subject to flash flooding, even during relatively minor events.

Gatton flood map

An unconventional modelling approach was adopted for this study to allow a significant number of mitigation options and iterations within a short time frame. Existing scenario TUFLOW models confirmed the complex overland flood flow within the catchments and that the existing infrastructure is undersized and is at capacity during minor flood events. Existing and mitigated scenario DRAINS models were developed to undertake a significant number of design options/iterations within a relatively short time frame. A wide range of mitigation options were investigated, sized and iterated for the hot spot areas. A high-level MCA identified which options were most viable to address the flood hot spot areas based on a quantitative assessment of options. The preferred option for each hot spot area was finalised and input into the developed scenario TUFLOW models.  From the mitigation options, a prioritisation schedule was developed which included a commentary on staging of works.

Lockyer Valley Regional Council inherited the prioritisation schedule, concept designs and suggested improvements to existing detention basins, ready to take to the next phase detailed design, financing and construction.

Related Projects

Millmerran flood map
Toowoomba Regional Council

Millmerran Urban Stormwater Master Plan

The aim of this project was also to investigate and address local stormwater quality conditions and future requirements relating to Water Sensitive Urban Design (WSUD).
Washpool
Rockhampton Regional Council

Washpool Road Preliminary Design of Stormwater Infrastructure

WMS was engaged by Rockhampton Regional Council to identify and prioritise Council’s plan for future trunk infrastructure (PFTIs) for the Washpool Road area.
Marshall Precinct
City of Greater Geelong

Marshall Precinct Stormwater Management Strategy

The primary aim of the SWMS is to investigate the impact that the transition from rural residential land uses into predominantly urban, residential development will have on surface water within and beyond the PSP boundary.