Alinta Energy Development Pty Ltd

Scope

Regional and Local hydrological and hydraulic modelling across a 20-ha lot to inform placement of infrastructure

Impact

WMS conducted a Surface Water Assessment of the SWIS Peaker Project, evaluating existing and post-development hydrologic and hydraulic conditions. WMS confirmed that the proposed site layout would have minimal impact to regional and local hydrological regimes.
Blake Marxsen
Questions? Get in touch today.
Blake Marxsen

Client

Alinta Energy Development Pty Ltd

Scope

Regional and Local hydrological and hydraulic modelling across a 20-ha lot to inform placement of infrastructure

Impact

WMS conducted a Surface Water Assessment of the SWIS Peaker Project, evaluating existing and post-development hydrologic and hydraulic conditions. WMS confirmed that the proposed site layout would have minimal impact to regional and local hydrological regimes.

Alinta Energy Development Pty Ltd (Alinta) was investigating the option to develop approximately 400 megawatts (MW) of fast-start, open-cycle gas turbines to be connected to the South West Interconnected System (SWIS), known as the SWIS Peaker Project. The proposed location is on cleared agricultural land approximately 200 kilometres north of Perth, near the town of Cataby.

Cataby Aerial

The stormwater analysis confirmed that overland runoff within the site can be managed through internal drainage systems. The risk of downstream scour and sedimentation was minimal, as flow velocities were projected to remain below critical thresholds. However, if significant alterations occur to runoff coefficients, landcover or the terrain of the Iluka mine site post-closure, diverging substantially from the pre-existing conditions, the Project may require re-evaluation. Nonetheless, it is anticipated that stormwater flows will remain below critical velocities for the 1% AEP.

The study revealed no significant or irreversible impact on inland water environmental values, indicating that the project aligns with the Environmental Protection Authority objectives to maintain surface water quality.

Related Projects

City of Gold Coast

Biggera Creek Hydraulic Model Peer Review

Auckland Creek
Gladstone Regional Council

Auckland Creek Flood Study

Gladstone Regional Council commissioned WMS to update existing hydrologic and hydraulic models for Auckland Creek and undertake a new flood study of Auckland Creek.
NSW Office of Environment and Heritage

Barwon Darling & Gwydir Floodplain Hydraulic Modelling

Latrobe Aerial View 1
Latrobe City Council

Latrobe Valley Stormwater Study

Urban stormwater study focusing on the townships of Traralgon, Morwell, Moe, and Newborough
Queensland Rail

Kooltandra Flood Study

SMEC

Wallsend Flood Risk Management Plan

Daly St Site Visit 1
Clare & Gilbert Valleys Council

Daly St Drainage Detailed Design 

Stormwater impact assessment