SWIS Peaker Project | WMS Engineering
3907 Brand Hwy, Cataby WA 6507, Australia

SWIS Peaker Project

Surface water assessment
Blake Marxsen
Questions? Get in touch today.
Blake Marxsen

Client

Alinta Energy Development Pty Ltd

Scope

Regional and Local hydrological and hydraulic modelling across a 20-ha lot to inform placement of infrastructure

Impact

WMS conducted a Surface Water Assessment of the SWIS Peaker Project, evaluating existing and post-development hydrologic and hydraulic conditions. WMS confirmed that the proposed site layout would have minimal impact to regional and local hydrological regimes.
Blake Marxsen
Questions? Get in touch today.
Blake Marxsen

Client

Alinta Energy Development Pty Ltd

Scope

Regional and Local hydrological and hydraulic modelling across a 20-ha lot to inform placement of infrastructure

Impact

WMS conducted a Surface Water Assessment of the SWIS Peaker Project, evaluating existing and post-development hydrologic and hydraulic conditions. WMS confirmed that the proposed site layout would have minimal impact to regional and local hydrological regimes.

Alinta Energy Development Pty Ltd (Alinta) was investigating the option to develop approximately 400 megawatts (MW) of fast-start, open-cycle gas turbines to be connected to the South West Interconnected System (SWIS), known as the SWIS Peaker Project. The proposed location is on cleared agricultural land approximately 200 kilometres north of Perth, near the town of Cataby.

Cataby Aerial

The stormwater analysis confirmed that overland runoff within the site can be managed through internal drainage systems. The risk of downstream scour and sedimentation was minimal, as flow velocities were projected to remain below critical thresholds. However, if significant alterations occur to runoff coefficients, landcover or the terrain of the Iluka mine site post-closure, diverging substantially from the pre-existing conditions, the Project may require re-evaluation. Nonetheless, it is anticipated that stormwater flows will remain below critical velocities for the 1% AEP.

The study revealed no significant or irreversible impact on inland water environmental values, indicating that the project aligns with the Environmental Protection Authority objectives to maintain surface water quality.

Related Projects

summerfield aerial view
iCubed Consulting Pty Ltd

Summerfield BESS Flood Impact Assessment

Hydraulic assessment to inform site layout and surface water management
Arup

Roseneath Unsealed Roads Hydraulic Assessment

City of Gold Coast

Loders Creek Hydraulic Model Peer Review

Marshall Precinct
City of Greater Geelong

Marshall Precinct Stormwater Management Strategy

The primary aim of the SWMS is to investigate the impact that the transition from rural residential land uses into predominantly urban, residential development will have on surface water within and beyond the PSP boundary.
Opus International Consultants (now part of WSP)

State Highway 2 Upgrade

Shoalhaven City Council

Millards Creek Flood Study

Queensland Rail

Mount Ossa Flood Study