SWIS Peaker Project | WMS Engineering
3907 Brand Hwy, Cataby WA 6507, Australia

SWIS Peaker Project

Surface water assessment
Blake Marxsen
Questions? Get in touch today.
Blake Marxsen

Client

Alinta Energy Development Pty Ltd

Scope

Regional and Local hydrological and hydraulic modelling across a 20-ha lot to inform placement of infrastructure

Impact

WMS conducted a Surface Water Assessment of the SWIS Peaker Project, evaluating existing and post-development hydrologic and hydraulic conditions. WMS confirmed that the proposed site layout would have minimal impact to regional and local hydrological regimes.
Blake Marxsen
Questions? Get in touch today.
Blake Marxsen

Client

Alinta Energy Development Pty Ltd

Scope

Regional and Local hydrological and hydraulic modelling across a 20-ha lot to inform placement of infrastructure

Impact

WMS conducted a Surface Water Assessment of the SWIS Peaker Project, evaluating existing and post-development hydrologic and hydraulic conditions. WMS confirmed that the proposed site layout would have minimal impact to regional and local hydrological regimes.

Alinta Energy Development Pty Ltd (Alinta) was investigating the option to develop approximately 400 megawatts (MW) of fast-start, open-cycle gas turbines to be connected to the South West Interconnected System (SWIS), known as the SWIS Peaker Project. The proposed location is on cleared agricultural land approximately 200 kilometres north of Perth, near the town of Cataby.

Cataby Aerial

The stormwater analysis confirmed that overland runoff within the site can be managed through internal drainage systems. The risk of downstream scour and sedimentation was minimal, as flow velocities were projected to remain below critical thresholds. However, if significant alterations occur to runoff coefficients, landcover or the terrain of the Iluka mine site post-closure, diverging substantially from the pre-existing conditions, the Project may require re-evaluation. Nonetheless, it is anticipated that stormwater flows will remain below critical velocities for the 1% AEP.

The study revealed no significant or irreversible impact on inland water environmental values, indicating that the project aligns with the Environmental Protection Authority objectives to maintain surface water quality.

Related Projects

juwi Renewable Energy

Dulacca Solar Farm Stormwater Assessment

Queensland Rail

Mount Ossa Flood Study

Public Safety Business Agency

Mossman Stormwater Management Plan

City of Gold Coast

Currumbin Creek Hydraulic Model Peer Review

Nyngan Site Visit 1
Bogan Shire Council

Management Protocols Document Development

Development of an Operating Protocols Document for the Bogan Shire Water Supply Scheme
Narrandera Shire Council

Narrandera Detention Basin Strategy and Design

Daly St Site Visit 1
Clare & Gilbert Valleys Council

Daly St Drainage Detailed Design 

Stormwater impact assessment