Tuvatu Gold Mine Hydrologic Investigation Review | WMS Engineering
Tuvatu Creek, Fiji

Tuvatu Gold Mine Hydrologic Investigation Review

Questions? Get in touch today.

Client

Entec

Scope

Impact

Questions? Get in touch today.

Client

Entec

Scope

Impact

Related Projects

City of Gold Coast

Broadwater Master Plan

Parade Streetscape Aerial
Dryside Engineering

Parade Streetscape Upgrade

Flood impact assessment to support the Parade Masterplan
Road near Drummond Creek
Isaac Regional Council

Design of Drummond Creek Floodway

A new floodway design improving flood immunity whilst maintaining design speed requirements
Fiji - Viti Levu bridge site
Fiji Roads Authority (FRA)

Hydraulic Design of Viti Levu Bridges

Working with Entec, WMS undertook the hydrologic and hydraulic analyses and scour assessments to inform detailed design of four bridges on the island of Viti Levu.
Millmerran flood map
Toowoomba Regional Council

Millmerran Urban Stormwater Master Plan

The aim of this project was also to investigate and address local stormwater quality conditions and future requirements relating to Water Sensitive Urban Design (WSUD).
Gatton flood map
Toowoomba Regional Council

Stormwater Catchment Modelling, Planning and Design for Gatton

WMS, in conjunction with RMA Engineers, were commissioned to undertake stormwater catchment modelling, planning and design for the township of Gatton.
Queensland Rail

Kooltandra Flood Study