Cooyar Urban Stormwater Management Plan Peer Review
Tenterfield Shire Council
Tenterfield Dam Bathymetric Survey
WMS conducted a highly accurate bathymetric survey using a Sontek M9 ADCP to accurately determine the volume of water remaining in the dam and the volume of sediment.
Cairns Regional Council
Jalarra Park Detention Basin
WMS teamed up with civil engineering firm Dryside Engineering to deliver the FIA and detailed design of the basin.
icubed consulting
MacIntyre Wind Farm Flood Assessment
Yass Valley Council
Yass Valley Timber Bridge Replacements
Dryside Engineering
Parade Streetscape Upgrade
Flood impact assessment to support the Parade Masterplan
Toowoomba Regional Council
Maclagan and Quinalow Floodplain Risk Management Study and Plan