Wallsend Flood Risk Management Plan | WMS Engineering
Wallsend NSW, Australia

Wallsend Flood Risk Management Plan

Questions? Get in touch today.

Client

SMEC

Scope

Impact

Questions? Get in touch today.

Client

SMEC

Scope

Impact

Related Projects

Toowoomba Regional Council

Cooyar Urban Stormwater Management Plan Peer Review

Tenterfield
Tenterfield Shire Council

Tenterfield Dam Bathymetric Survey

WMS conducted a highly accurate bathymetric survey using a Sontek M9 ADCP to accurately determine the volume of water remaining in the dam and the volume of sediment.
Jallara Park Drawing
Cairns Regional Council

Jalarra Park Detention Basin

WMS teamed up with civil engineering firm Dryside Engineering to deliver the FIA and detailed design of the basin.
icubed consulting

MacIntyre Wind Farm Flood Assessment

Yass Valley Council

Yass Valley Timber Bridge Replacements

Parade Streetscape Aerial
Dryside Engineering

Parade Streetscape Upgrade

Flood impact assessment to support the Parade Masterplan
Toowoomba Regional Council

Maclagan and Quinalow Floodplain Risk Management Study and Plan