Cowra Water Treatment Plant Reservoir CFD Modelling
CFD modelling to determine chlorine contact time
Dryside Engineering
Parade Streetscape Upgrade
Flood impact assessment to support the Parade Masterplan
VIC Department of Environment, Land, Water and Planning (DELWP)
Russell Creek Flood Mitigation Review
Queensland Rail
Mount Ossa Flood Study
Entec
Tuvatu Gold Mine Hydrologic Investigation Review
Tenterfield Shire Council
Tenterfield Dam Bathymetric Survey
WMS conducted a highly accurate bathymetric survey using a Sontek M9 ADCP to accurately determine the volume of water remaining in the dam and the volume of sediment.