Flood impact assessment for a proposed residential subdivision
Tenterfield Shire Council
Tenterfield Dam Bathymetric Survey
WMS conducted a highly accurate bathymetric survey using a Sontek M9 ADCP to accurately determine the volume of water remaining in the dam and the volume of sediment.
Toowoomba Regional Council
Jondaryan Floodplain Risk Management Study and Plan
Queensland Rail
Duck Creek Flood Study
Toowoomba Regional Council
Stormwater Catchment Modelling, Planning and Design for Gatton
WMS, in conjunction with RMA Engineers, were commissioned to undertake stormwater catchment modelling, planning and design for the township of Gatton.