WMS conducted a highly accurate bathymetric survey using a Sontek M9 ADCP to accurately determine the volume of water remaining in the dam and the volume of sediment.
Toowoomba Regional Council
Maclagan and Quinalow Floodplain Risk Management Study and Plan
Toowoomba Regional Council
Cooyar Urban Stormwater Management Plan Peer Review
Entec
Waqadra Subdivision Flood Assessment
Brisbane City Council
Hay Street Pedestrian Bridge Replacement
The objective of this project was to undertake hydraulic modelling and flood impact assessment to inform the design of the new bridge.