Development of an Operating Protocols Document for the Bogan Shire Water Supply Scheme
Toowoomba Regional Council
Stormwater Catchment Modelling, Planning and Design for Gatton
WMS, in conjunction with RMA Engineers, were commissioned to undertake stormwater catchment modelling, planning and design for the township of Gatton.
icubed consulting
MacIntyre Wind Farm Flood Assessment
Fiji Roads Authority (FRA)
Hydraulic Design of Viti Levu Bridges
Working with Entec, WMS undertook the hydrologic and hydraulic analyses and scour assessments to inform detailed design of four bridges on the island of Viti Levu.
Alluvium for Wellington Shire Council
Maffra Drainage and Integrated Water Management Strategy
Swan Hill Rural City Council
Swan Hill Drainage Strategy
Assessment of current drainage performance, identification of capacity shortfalls and investigation of potential mitigation options