Daly St Drainage Detailed Design  | WMS Engineering
Powell St, Clare SA, Australia

Daly St Drainage Detailed Design 

Stormwater impact assessment
Ashley
Questions? Get in touch today.
Ashley Chen

Client

Clare & Gilbert Valleys Council

Scope

Assessment of stormwater conditions and provision of mitigation recommendations

Impact

Significant reduction in peak flood levels and flood risk, improving safety with properties previously prone to flooding now protected.
Ashley
Questions? Get in touch today.
Ashley Chen

Client

Clare & Gilbert Valleys Council

Scope

Assessment of stormwater conditions and provision of mitigation recommendations

Impact

Significant reduction in peak flood levels and flood risk, improving safety with properties previously prone to flooding now protected.

The Clare and Gilbert Valley Council, situated in the mid-north of South Australia along the Hutt River, engaged WMS through MLEI Consulting Engineers to undertake a flood mitigation study for Daly Street in Clare. The suburb of Clare, covers approximately 10 km², primarily consisting of low-density residential areas within the township and rural land around its outskirts. The study aimed to investigate flooding mechanisms within the area, model stormwater behaviour, and develop mitigation solutions that would alleviate future flooding while ensuring no adverse impacts downstream.

Daly St Site Visit 1

As part of the study, WMS assessed and modelled the existing stormwater conditions for the 1% and 10% Annual Exceedance Probability (AEP) events using a detailed 2D hydraulic model of the catchment. A summary report was prepared, including stormwater mapping and initial recommendations for mitigation measures to reduce flood impacts. After receiving feedback from MLEI, the model was updated to incorporate the proposed mitigation works, and the revised scenario was analysed for both AEP events. The final report provided stormwater mapping of the mitigation options along with a comprehensive summary of the proposed solutions.

The results of the study demonstrated significant improvements in flood behaviour as a result of the proposed works. In the 1% AEP event, peak flood levels along Agnes Street and King Street were reduced by 0.12 m and 0.07 m, respectively, and properties east of Agnes Street were no longer subject to flooding due to the construction of a bund along existing swales. Additionally, large areas became flood-free in the proposed scenario, with most of the flood hazard classified as H1, indicating safety for people, vehicles, and buildings. Importantly, the study confirmed that there was no redistribution of runoff or material changes to flood risk within the catchment as a result of the proposed works.

Related Projects

Public Safety Business Agency

Mossman Stormwater Management Plan

Toowoomba Regional Council

Yarraman Urban Stormwater Management Plan Peer Review

City of Gold Coast

Tallebudgera Creek Hydraulic Model Peer Review

HARC (for Townsville City Council)

City-wide Hydrological Review

Toowoomba Regional Council

Cooyar Urban Stormwater Management Plan Peer Review

Swan Hill Site Visit 1
Swan Hill Rural City Council

Swan Hill Drainage Strategy

Assessment of current drainage performance, identification of capacity shortfalls and investigation of potential mitigation options
Casuarina Bridge 1
Cairns Regional Council

Casuarina Street Emergency Works | Hydraulic Assessment

Hydraulic bridge design