Daly St Drainage Detailed Design 

Stormwater impact assessment
Ashley
Questions? Get in touch today.
Ashley Chen

Client

Clare & Gilbert Valleys Council

Scope

Assessment of stormwater conditions and provision of mitigation recommendations

Impact

Significant reduction in peak flood levels and flood risk, improving safety with properties previously prone to flooding now protected.
Ashley
Questions? Get in touch today.
Ashley Chen

Client

Clare & Gilbert Valleys Council

Scope

Assessment of stormwater conditions and provision of mitigation recommendations

Impact

Significant reduction in peak flood levels and flood risk, improving safety with properties previously prone to flooding now protected.

The Clare and Gilbert Valley Council, situated in the mid-north of South Australia along the Hutt River, engaged WMS through MLEI Consulting Engineers to undertake a flood mitigation study for Daly Street in Clare. The suburb of Clare, covers approximately 10 km², primarily consisting of low-density residential areas within the township and rural land around its outskirts. The study aimed to investigate flooding mechanisms within the area, model stormwater behaviour, and develop mitigation solutions that would alleviate future flooding while ensuring no adverse impacts downstream.

Daly St Site Visit 1

As part of the study, WMS assessed and modelled the existing stormwater conditions for the 1% and 10% Annual Exceedance Probability (AEP) events using a detailed 2D hydraulic model of the catchment. A summary report was prepared, including stormwater mapping and initial recommendations for mitigation measures to reduce flood impacts. After receiving feedback from MLEI, the model was updated to incorporate the proposed mitigation works, and the revised scenario was analysed for both AEP events. The final report provided stormwater mapping of the mitigation options along with a comprehensive summary of the proposed solutions.

The results of the study demonstrated significant improvements in flood behaviour as a result of the proposed works. In the 1% AEP event, peak flood levels along Agnes Street and King Street were reduced by 0.12 m and 0.07 m, respectively, and properties east of Agnes Street were no longer subject to flooding due to the construction of a bund along existing swales. Additionally, large areas became flood-free in the proposed scenario, with most of the flood hazard classified as H1, indicating safety for people, vehicles, and buildings. Importantly, the study confirmed that there was no redistribution of runoff or material changes to flood risk within the catchment as a result of the proposed works.

Related Projects

Alluvium for Wellington Shire Council

Maffra Drainage and Integrated Water Management Strategy

Arup

Coffs Harbour Bypass EIS & Concept Design

TC Alfred coastal erosion
NSW Crown Lands

Flood Impact Assessment of Crown Lands Assets

Condition Assessments and Recommendations for Remediation Actions
Opus International Consultants (now part of WSP)

State Highway 2 Upgrade

Fiji - Viti Levu bridge site
Fiji Roads Authority (FRA)

Hydraulic Design of Viti Levu Bridges

Working with Entec, WMS undertook the hydrologic and hydraulic analyses and scour assessments to inform detailed design of four bridges on the island of Viti Levu.
Toowoomba Regional Council

Clifton Urban Stormwater Management Plan Peer Review

Toowoomba Regional Council

Crows Nest Floodplain Risk Management Study and Plan