Daly St Drainage Detailed Design  | WMS Engineering
Powell St, Clare SA, Australia

Daly St Drainage Detailed Design 

Stormwater impact assessment
Ashley
Questions? Get in touch today.
Ashley Chen

Client

Clare & Gilbert Valleys Council

Scope

Assessment of stormwater conditions and provision of mitigation recommendations

Impact

Significant reduction in peak flood levels and flood risk, improving safety with properties previously prone to flooding now protected.
Ashley
Questions? Get in touch today.
Ashley Chen

Client

Clare & Gilbert Valleys Council

Scope

Assessment of stormwater conditions and provision of mitigation recommendations

Impact

Significant reduction in peak flood levels and flood risk, improving safety with properties previously prone to flooding now protected.

The Clare and Gilbert Valley Council, situated in the mid-north of South Australia along the Hutt River, engaged WMS through MLEI Consulting Engineers to undertake a flood mitigation study for Daly Street in Clare. The suburb of Clare, covers approximately 10 km², primarily consisting of low-density residential areas within the township and rural land around its outskirts. The study aimed to investigate flooding mechanisms within the area, model stormwater behaviour, and develop mitigation solutions that would alleviate future flooding while ensuring no adverse impacts downstream.

Daly St Site Visit 1

As part of the study, WMS assessed and modelled the existing stormwater conditions for the 1% and 10% Annual Exceedance Probability (AEP) events using a detailed 2D hydraulic model of the catchment. A summary report was prepared, including stormwater mapping and initial recommendations for mitigation measures to reduce flood impacts. After receiving feedback from MLEI, the model was updated to incorporate the proposed mitigation works, and the revised scenario was analysed for both AEP events. The final report provided stormwater mapping of the mitigation options along with a comprehensive summary of the proposed solutions.

The results of the study demonstrated significant improvements in flood behaviour as a result of the proposed works. In the 1% AEP event, peak flood levels along Agnes Street and King Street were reduced by 0.12 m and 0.07 m, respectively, and properties east of Agnes Street were no longer subject to flooding due to the construction of a bund along existing swales. Additionally, large areas became flood-free in the proposed scenario, with most of the flood hazard classified as H1, indicating safety for people, vehicles, and buildings. Importantly, the study confirmed that there was no redistribution of runoff or material changes to flood risk within the catchment as a result of the proposed works.

Want to discuss a similar project? Get a quote today.

Get a Quote

Related Projects

Charters Towers river flood map
Charters Towers Regional Council

Charters Towers Retention Basin Modelling

Feasibility Assessment of Two Proposed Retention Basins
murray basin
NSW Department of Planning, Industry and Environment (DPIE)

Murray Land & Water Management

NSW DPIE engaged WMS to update the Murray LWMP salinity modelling framework using contemporary platforms
Jallara Park Drawing
Cairns Regional Council

Jalarra Park Detention Basin

WMS teamed up with civil engineering firm Dryside Engineering to deliver the FIA and detailed design of the basin.
Noosa Aerial photo
Sunshine Coast Council

Sunshine LGA Road Immunity Analysis

Semi-automated Tool Development
Water Level @ Bendigo Creek, Bay Street Golden Square
City of Greater Bendigo Council

Kangaroo Flat and Golden Square Flood Mitigation Study

A wonderful collaboration between government bodies, experts and the community that delivered effective solutions to mitigate future flood events.
TC Alfred coastal erosion
NSW Crown Lands

Flood Impact Assessment of Crown Lands Assets

Condition Assessments and Recommendations for Remediation Actions
Local Government map
Toowoomba Regional Council

Whole of LGA Flood Mapping

A Rapid, Low Cost Alternative to Detailed Flood Studies