Glengarry Stormwater Study | WMS Engineering
Cairnbrook Rd, Glengarry VIC, Australia

Glengarry Stormwater Study

Comprehensive flood mitigation study for the township of Glengarry
Ashley
Questions? Get in touch today.
Ashley Chen

Client

Latrobe City Council

Scope

Flood study with modelling, analysis, mitigation findings, and recommendations for LCC

Impact

Effective solutions to reduce flood risks in Glengarry, ensuring community safety and minimising property damage during major flood events
Ashley
Questions? Get in touch today.
Ashley Chen

Client

Latrobe City Council

Scope

Flood study with modelling, analysis, mitigation findings, and recommendations for LCC

Impact

Effective solutions to reduce flood risks in Glengarry, ensuring community safety and minimising property damage during major flood events

WMS was engaged by Latrobe City Council (LCC) to conduct a comprehensive flood mitigation study for the township of Glengarry. This project aimed to review and enhance previous hydraulic models, particularly focusing on the waterways Eaglehawk Creek and Four Mile Creek in alignment with the updated Australian Rainfall and Runoff Guidelines (ARR19). The study involved hydraulic modelling using TUFLOW software for flood behaviour assessment during a 1% Annual Exceedance Probability event.

Glengarry Mapped

The project assessed four mitigation options collaboratively developed with LCC and the West Gippsland Catchment Management Authority (WGCMA). Results indicated that the Traralgon Maffra Road Levee Mitigation Option was the most effective, significantly reducing flood risk with minimal adverse off-site impacts.

Glengarry Site Visit

WMS recommended further steps, including a comprehensive cost-benefit analysis of the detailed mitigation options. These proactive measures guided Council in prioritising flood risk reduction strategies, ensuring community resilience and long-term sustainability for the Glengarry township.

Related Projects

Noosa Aerial photo
Sunshine Coast Council

Sunshine LGA Road Immunity Analysis

Semi-automated Tool Development
Opus International Consultants (now part of WSP)

Finke River Crossing Flood Study

Collinson McKinnon Basin
Cairns Regional Council

McKinnon Creek Detention Basin Failure Impact Assessment

WMS was engaged to undertake a comprehensive Failure Impact Assessment (FIA) for the McKinnon Creek Detention Basin

Buchan Caves Reserve – Flood Modelling

Parade Streetscape Aerial
Dryside Engineering

Parade Streetscape Upgrade

Flood impact assessment to support the Parade Masterplan
Jallara Park Drawing
Cairns Regional Council

Jalarra Park Detention Basin

WMS teamed up with civil engineering firm Dryside Engineering to deliver the FIA and detailed design of the basin.
murray basin
NSW Department of Planning, Industry and Environment (DPIE)

Murray Land & Water Management

NSW DPIE engaged WMS to update the Murray LWMP salinity modelling framework using contemporary platforms