Hay Street Pedestrian Bridge Replacement | WMS Engineering
Hay Street, Mitchelton Brisbane, QLD, Australia

Hay Street Pedestrian Bridge Replacement

The objective of this project was to undertake hydraulic modelling and flood impact assessment to inform the design of the new bridge.
Blake Boulton
Questions? Get in touch today.
Blake Boulton

Client

Brisbane City Council

Scope

Hydraulic modelling and flood impact assessment to inform a new bridge design

Impact

Hydraulic design of a new replacement bridge which has already been constructed
Blake Boulton
Questions? Get in touch today.
Blake Boulton

Client

Brisbane City Council

Scope

Hydraulic modelling and flood impact assessment to inform a new bridge design

Impact

Hydraulic design of a new replacement bridge which has already been constructed

As part of a rolling renewal process, Brisbane City Council is replacing the existing wooden pedestrian bridges including the bridge at Hay Street in Mitchelton.  The objective of this project was to undertake hydraulic modelling and flood impact assessment to inform the design of the new bridge.

Existing 1D hydraulic models (HECRAS and MIKE 11) were used to inform the development of a new 2D hydraulic model (TUFLOW). The TUFLOW model was then validated to the existing 1D models before being used to simulate the existing and design bridges for a range of design storms. Modelling for several iterations of the design bridge were undertaken with the model results used to inform the design process. Modelling of the final design indicated a general reduction of flood levels to properties upstream and adjacent to the bridge.

Hay Street Pedestrian Bridge
Hay Street Pedestrian Bridge

Related Projects

Pallamallawa and community involvement
Moree Plains Shire Council

Pallamallawa Levee Design Review

WMS partnered with Dryside Engineering to deliver the Pallamallawa Northern Levee Second Design Review
TC Alfred coastal erosion
NSW Crown Lands

Flood Impact Assessment of Crown Lands Assets

Condition Assessments and Recommendations for Remediation Actions
Local Government map
Toowoomba Regional Council

Whole of LGA Flood Mapping

A Rapid, Low Cost Alternative to Detailed Flood Studies
Marshall Precinct
City of Greater Geelong

Marshall Precinct Stormwater Management Strategy

The primary aim of the SWMS is to investigate the impact that the transition from rural residential land uses into predominantly urban, residential development will have on surface water within and beyond the PSP boundary.
Fiji - Viti Levu bridge site
Fiji Roads Authority (FRA)

Hydraulic Design of Viti Levu Bridges

Working with Entec, WMS undertook the hydrologic and hydraulic analyses and scour assessments to inform detailed design of four bridges on the island of Viti Levu.
Collinson McKinnon Basin
Cairns Regional Council

McKinnon Creek Detention Basin Failure Impact Assessment

WMS was engaged to undertake a comprehensive Failure Impact Assessment (FIA) for the McKinnon Creek Detention Basin
Toowomba Second Range Crossing
Toowoomba Regional Council

Toowoomba Second Range Crossing

Infrastructure of national significance