Nerang River Hydraulic Model Peer Review | WMS Engineering
Nerang River, Queensland, Australia

Nerang River Hydraulic Model Peer Review

Questions? Get in touch today.

Client

City of Gold Coast

Scope

Impact

Questions? Get in touch today.

Client

City of Gold Coast

Scope

Impact

Related Projects

Tenterfield
Tenterfield Shire Council

Tenterfield Dam Bathymetric Survey

WMS conducted a highly accurate bathymetric survey using a Sontek M9 ADCP to accurately determine the volume of water remaining in the dam and the volume of sediment.
Noosa Aerial photo
Sunshine Coast Council

Sunshine LGA Road Immunity Analysis

Semi-automated Tool Development
Swan Hill Site Visit 1
Swan Hill Rural City Council

Swan Hill Drainage Strategy

Assessment of current drainage performance, identification of capacity shortfalls and investigation of potential mitigation options
Shoalhaven City Council

Currarong Creek Flood Study

Marshall Precinct
City of Greater Geelong

Marshall Precinct Stormwater Management Strategy

The primary aim of the SWMS is to investigate the impact that the transition from rural residential land uses into predominantly urban, residential development will have on surface water within and beyond the PSP boundary.
City of Greater Bendigo

Racecourse Creek Levee Design

AFPS Graph for Macquarie Marshes
Australian Fish Passage Services

Inland NSW Fish Passage

Australian Fish Passage Services commissioned WMS to quantify the hydraulic impacts to water volumes at a proposed fish passage in inland NSW