
Jalarra Park Detention Basin
WMS teamed up with civil engineering firm Dryside Engineering to deliver the FIA and detailed design of the basin.
Waqadra Subdivision Flood Assessment
Woongoolba Floodplain Analysis

Buchan Caves Reserve – Flood Modelling
Hydraulic assessment to inform post-disaster restoration
Public Safety Business Agency
Mossman Stormwater Management Plan

City of Greater Bendigo Council
Kangaroo Flat and Golden Square Flood Mitigation Study
A wonderful collaboration between government bodies, experts and the community that delivered effective solutions to mitigate future flood events.